Skip to main content

News Releases

 PDF   Print   View All
Feb 05, 2015
Plains All American Pipeline Announces Two New Pipelines to Transport Crude, Condensate from Delaware Basin, Plus Additional Permian Basin Expansions

Plains All American Pipeline, L.P. (NYSE: PAA) today announced plans to construct two new Delaware Basin pipelines and related gathering systems, to expand its existing Blacktip station and to construct a 20" loop line from Blacktip station to Wink, Texas. These new infrastructure builds in West Texas and New Mexico will support PAA's previously announced 24" Basin Pipeline loop from Wink to Midland and new 12" pipeline from Monahans to Crane. The new Delaware Basin pipelines, Avalon Extension and State Line, are backed by producer commitments.

The 32-mile, 12" Avalon Extension pipeline will extend the Avalon pipeline, which runs from the PAA Avalon station in northwest Loving County to its Blacktip station in southeast Loving County, Texas, into Culberson County, Texas, and is capable of transporting up to 100,000 barrels per day (bpd) of crude oil from northern Loving and Culberson Counties. The line and two new truck unloading facilities at Orla, Texas and at Highway 285 are expected to be brought into service in phases beginning in July 2015, with total system completion, including the associated gathering system, scheduled for September 2015.

The 60-mile, 16" State Line pipeline will connect Culberson County to Wink, Texas, running along the Texas-New Mexico state line. State Line will connect Delaware Basin production in southern Eddy and Lea Counties in New Mexico and northern Loving, Reeves and Culberson Counties in Texas to the existing network of PAA Permian Basin assets. The pipeline will be capable of transporting up to 150,000 bpd of batched crude oil and condensate. State Line is expected to be brought into service in phases beginning in early 2016 and concluding in mid-2016, with completion of the associated gathering system anticipated by early 2016.

The Blacktip station expansion and pipeline loop will include building 200,000 barrels of new operational tankage and associated pumping to provide an additional 200,000 bpd of pipeline capacity from the Blacktip station to Wink. The Blacktip station expansion and loop pipeline are expected to be completed in August 2015.

Plains All American Pipeline, L.P. is a publicly traded master limited partnership that owns and operates midstream energy infrastructure and provides logistics services for crude oil, natural gas liquids ("NGL"), natural gas and refined products. PAA owns an extensive network of pipeline transportation, terminalling, storage and gathering assets in key crude oil and NGL producing basins and transportation corridors and at major market hubs in the United States and Canada. On average, PAA handles over 4.1 million barrels per day of crude oil and NGL on its pipelines. PAA is headquartered in Houston, Texas.

Forward Looking Statements

Certain matters discussed in this release are forward-looking statements that involve risks and uncertainties that could cause actual results or outcomes to differ materially from results or outcomes anticipated in the forward-looking statements. These risks and uncertainties include, among other things, shortages, cost increases or delays in receipt of supplies, materials or labor; inability to obtain, delays in the receipt of, or other issues associated with necessary licenses, permits, approvals, consents, rights of way or other governmental or third party requirements; the impact of current and future laws, rulings, orders, governmental regulations, accounting standards and statements and related interpretations; weather interference with business operations or project construction, including the impact of extreme weather events or conditions; environmental liabilities, issues or events that result in construction delays or otherwise impact targeted in-service dates; interruptions in service on third-party pipelines or facilities; general economic, market or business conditions and the amplification of other risks caused by volatile financial markets, capital constraints and pervasive liquidity concerns; and other factors and uncertainties inherent in the transportation, storage, terminalling and marketing of crude oil and refined products as discussed in PAA's filings with the Securities and Exchange Commission.

Plains All American Pipeline, L.P.
Investors:
Ryan Smith, (866) 809-1291
Director, Investor Relations
Media:
Brad Leone, (866) 809-1290
Director, Communications

Back to top

Privacy